Ga Rib Metal Roof Installation Instructions

Install the roof substrate according to local building code requirements.
Ga rib metal roof installation instructions. 12 16 skyline roofing 26 gauge. For use by its customers and is intended to be a guide only. 36 nor clad 29 gauge. The installation of metal roof systems is a dangerous procedure and should be supervised by trained knowl.
5 rib roofing panels must be applied on a minimum roof pitch of 2 12 or greater. 36 delta rib iii 29 gauge. Butyl tape as shown below is recommended along panel side laps. At this point chalk a line from ridge to eave.
29 ga and 26 ga standard. Available in the following metal roofing and siding. Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof line. Metal roofing from georgia metals is higher quality but not necessarily higher priced.
That said please beware when shopping for your metal roofing project sometimes a lower price may indicate a lower quality such as a thinner metal lower yield strength or an inferior paint. It is extremely important that this panel be laid square to the eave and ridge so that the remaining panels will line up square on the roof frame. Install eave trim valley trim and inside closure prior study the details section of this manual prior to the to panel installation. Install screws every 6 10 inches.
We strive to offer equal or even lower prices than competitors. Measure one panel width in from the roof edge. Another option is to install a or 7 8 lap stitch screw in the crown of the rib to secure the side lap. This guide must by read in its entirety before beginning installation.
This guide is supplied by fabral inc. Install the roofing screws vertically along each rib in the panel. 24 ga optional 36 panel coverage 3 4 rib height. To guard against wind damage at the eaves and for a neatly finished appearance gable trim is recommended.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it. Preformed valley trim panel wood screw tuff rib panel. 3 5 rib installation guidelines caution. Snap first two to three inches of panel together and slide the panel tight against the eave trim or with the gap depending on the temperature.
25 years limited lifetime. Place the leading edge of the first panel along this line. Install the panel a minimum of 3 up from the water diverter at the bottom of the valley and minimum of 3 down from the top of the valley. 36 strata rib 29 gauge.
See panel squaring method in this manual. Snap the panels together and fasten along the opposite side and top of the panel.