Gaco Roof Dry Time

Gaco is a best in class provider of silicone roof coating systems waterproofing and insulation solutions for commercial and residential buildings.
Gaco roof dry time. Allow 1st coat to dry thoroughly between 3 12 hours depending on climate before applying the 2nd coat. Application of top coats. 22 dry mils applying temperature. Allow the first coat to dry a minimum of 3 12 hours or until it can be walked on before coating with gacoroof 100 silicone roof coating product is moisture cure low humidity will result in longer dry times.
Smooth roofs can be completed in 2 coats lightly textured surfaces often require 3 coats and heavily textured surfaces may require 4 coats to achieve a final 22 dry mil film build. Gacopatch is now available in both a 2 gallon pail and a sausage tube. Gaco reveals revised 1 hour re entry time for trade workers with industry leading 10 ach. Allow a minimum of 12 hours before applying top coat.
Do not apply in temperatures below freezing above 120 f 49 c or if rain is expected within 2 hours. While bleedtrap will exhibit early rain resistance in as little as 30 minutes it should be allowed to thoroughly dry prior to application of primer or top coat. Coat within 48 hours. One 5 gallon pail covers 250 square feet of roof with 2 coats.
Final coat should be allowed to cure 24 to 48 hours depending on temperature and humidity before suitable for light foot traffic. Eliminates the need for primer on most substrates compared to previous generation gacoflex silicone coatings. Gacoroof is available in several colors to enhance the aesthetics of any roof. Gacopatch is a flashing grade stand alone silicone roof sealant designed to be installed in a single application on a variety of roof types including asphalt single ply metal and most existing coatings.
Gacoroof 100 silicone roof coating creates a seamless membrane to seal and repair existing roofs and permanently protect against leaks permanent ponding water and the damaging effects of severe weather. Three years from date of manufacture when stored in unopened containers between 40 85 f 4 29 c. Clean up maintenance. Allow 1st coat to dry thoroughly between 3 12 hours depending on climate before applying the 2nd coat.
It was developed to encapsulate the oil that commonly exudes from asphalt substrates and effectively traps it within the sealer to inhibit bleed through. Ideal for use on flat and sloped roofs including but not limited. Updates to the tax cuts and job act for 2019.