The clear seems to debond from concrete after awhile.
Garage slab siding starter course 6 clearance. Maintaining proper clearances reduces access to wood structures behind the siding by wood destroying insects or damage from water that might. The 8 height helps to get the garage up and above the present exterior grade and will be enough for the future. Pry off the siding and remove the wall photo 2. Anchor bolts and sills.
If you have vinyl aluminum or steel siding it s probably easier to remove it from the entire garage wall and reinstall it after the addition is built. I would put an 6 or 8 thick block 8 high on the existing slab. Since it is a rehab and then tie down a sill and put the garage back on it. Beyond the width of the addition to allow for 1 2 in.
Wall sheathing and 2 in. Most manufacturers produce a starter strip that secures the bottom course of siding to the sheathing and holds it at the proper angle. For pricing and availability. We cut the wood siding 2 1 2 in.
Epoxy in some anchor bolts to keep the garage in place. This should be nailed every 6 inches with it s lower edge running along the chalk line. This article will examine just that question of the recommended distance from ground and siding your clearance is vitally important for the siding s long term protection and safeguard. Ever wonder if siding is too close to the ground.
Siding materials need proper clearances between finish grade and the siding regardless the type of siding. By doing it ricks way you can leave the starter strip high enough off the slab to get the first course of vinyl into the starter strip and still prevent water from seeping under the shed. I have had better luck with white silicon than clear. This requirement is not just to prevent damage to the siding it serves a couple of other functions as well.
As shown in the diagram a wooden spacer can be used to provide the proper angle for the first strip. Do not use a j channel. Spectra 24 in x actual length smooth black over brown trim coil trim coil metal siding trim. Foundation plates or sills shall be bolted or anchored to the foundation or foundation wall per the follow ing crc r403 1 6 and crc r602.
Amerimax 3 in x 120 in unpainted aluminum starter strip metal siding trim. Having your siding too close to the ground is just asking. Flashing must be located beneath the first course of masonry above finished ground level above the foundation wall or slab and at other points of support including structural floors shelf angles and lintels when masonry veneers are designed per section r703 7.