Garage Slab Siding Starter Course

Be sure that nail length is sufficient to penetrate framing or framing plus nailable sheathing a total of 1 1 4 32mm.
Garage slab siding starter course. The area on a piece of siding that allows for another piece of siding or trim to be inserted. Plywood above this line to hold out the bottom of the first row of siding and nail the starter strip to this plywood. Staret strip secures the first course of siding to the home. It is an inexpensive approach to a combination floor footing system that can even be used in deep frost country if the soils drain well so as to prevent frost heave damage to any part of the garage foundation and.
Then nail a 3 1 2 in. For wood and cement fiber siding generally use 1 by 4 boards overlapped at the corners. The first course row of panels should be placed in the starter strip and securely locked along the entire length of the siding panel. Make sure the panel is securely locked before fastening.
This should be nailed every 6 inches with it s lower edge running along the chalk line. The clear seems to debond from concrete after awhile. Start with a level chalk line for the bottom starter strip and check the level periodically as you go up. This video shows how to install a starter strip for vinyl and polymer siding installation.
Garage doors openers spring repair is located at 2610 union st oakland ca 94607 510 698 5106. Cut vinyl pieces to fit with a saw or snips. Most manufacturers produce a starter strip that secures the bottom course of siding to the sheathing and holds it at the proper angle. For vinyl use special trim strips which should come with the.
Do not use a j channel. This next picture was taken in the crawl space. Multiple courses of siding are used to fill up an exterior wall. Of course sliding my knife under the siding at the concrete i didn t hit anything.
Fasten the panels in the center of the nailing slots see getting started for more information for specific information on fastening and fasteners. The entire rim joist was bug infested and rotted away over the whole length of the patio connection with the house. A course of siding refers to one row of siding that runs the length of an exterior wall. By doing it ricks way you can leave the starter strip high enough off the slab to get the first course of vinyl into the starter strip and still prevent water from seeping under the shed.
Simply amazing garage doors i need something like this in my portfolio. Whoops this is not going to be good i thought to myself. As shown in the diagram a wooden spacer can be used to provide the proper angle for the first strip. Garage door frame.